BUSINESS PARK MOST - Production and Warehouse Facility
Most 1
Description
- The Most location is strategically advantageous thanks to its good connections to major routes leading to Germany and its proximity to the D7 and D8 highways.
- Full-service logistics outsourcing (3PL) is available, covering all of the client’s warehousing and distribution needs.
- The warehouse space allows for the storage of chemical substances, including those subject to ADR regulations.
- The facility is equipped with an electronic fire alarm system (EPS), a CCTV system, and 24/7 security.
Available units
| Floor | Area | Availability | Price per month |
|---|---|---|---|
| PRODUCTION AND STORAGE FACILITY | 6 000 sqm | SEPTEMBER 2026 | Price on request |
| NEW HALL | 7 300 sqm | 9–12 MONTHS | Price on request |
Facilities
Dock leveller
Security
Parking
Direct entry